Grey Structure Construction Cost in Lahore – Complete 2025 Guide

Grey Structure Construction Cost in Lahore – Complete 2025 Guide

Grey Structure Construction Cost in Lahore – 2025 Guide for Home Builders

In recent years, Lahore has witnessed rapid urban expansion and increased residential construction, leading many homeowners and investors to inquire about the grey structure construction cost in Lahore. Understanding this cost is essential before starting any building project, whether it’s a 5 Marla, 10 Marla, or 1 Kanal house. A well-planned grey structure sets the foundation for the entire project, affecting both budget and timeline.

What is a Grey Structure in Construction?

Before breaking down the cost, it’s important to clarify what a grey structure includes. A grey structure, also known as the shell of the building, refers to the initial phase of construction that comprises:

Foundation and plinth beams

Columns, walls, and roof slab

Cement plaster (internal and external)

Boundary wall (if applicable)

Staircase, underground, and overhead water tanks

Basic plumbing and electrical conduits

Doors and windows (grill frames, not final fittings)

This stage excludes finishes such as tiles, paint, wooden fittings, electric switches, ceiling work, and sanitary fixtures.

Factors That Affect Grey Structure Cost in Lahore

Several variables impact the grey structure cost. Understanding these components helps homeowners and builders control costs and avoid budget overruns.

Plot Size and Design

The overall construction cost significantly varies based on the plot size. Building a 5 Marla house is less expensive compared to a 10 Marla or 1 Kanal house, not just due to size but also because of more complex designs and structural requirements.

Construction Material Quality

The choice of bricks, cement, sand, gravel (bajri), steel, and concrete influences the cost. High-quality materials may have a higher upfront cost but improve the structure’s durability and reduce long-term maintenance expenses.

Structural Design and Load Requirements

Engineered designs that require more reinforcement or thicker slabs to withstand higher loads can raise the cost of the grey structure.

Labor Charges

Labor rates in Lahore vary depending on the construction season, labor availability, and contractor experience. Rates typically increase during peak construction months.

Waterproofing and Foundation Type

Waterproofing materials, raft foundations, or pile foundations can add to the cost, especially in low-lying areas prone to waterlogging.

Soil Testing and Excavation

Soil testing determines the bearing capacity of land. Excavation depth and soil hardness affect the machinery, fuel, and labor involved.

Material Breakdown in Grey Structure Construction

Each material plays a critical role in the structure’s integrity. Here’s a general look at what is required:

Bricks

Bricks are the backbone of any structure. The number of bricks required depends on the covered area and the number of floors. A 5 Marla house may use tens of thousands of bricks, while larger houses require substantially more.

Cement

Used in almost every stage, cement is essential for concrete mixing, plastering, and binding. Cement cost varies with market demand and brand selection, which isn’t being mentioned here, per your request.

Sand (Ravi or Chenab)

Sand is used for concrete and plaster. Chenab sand is generally considered of higher quality, but it comes with a higher price.

Gravel (Bajri)

Used for roof slabs, beams, and lintels. There are typically two types: Margalla and Sargodha crush. Each has different price points and quality standards.

Steel

Steel bars are necessary for RCC (Reinforced Cement Concrete) in slabs, beams, and foundations. The quality and thickness (Sarya) of steel directly affect structural safety.

Plumbing and Electrical Conduits

Basic pipe installation and electric wiring layout are included in the grey structure phase. The final fixtures, however, are not.

Construction Process of Grey Structure

Here is a basic breakdown of the grey structure construction process in Lahore:

Step 1: Excavation and Foundation

Digging the plot based on the approved architectural and structural drawings is the first step. It is followed by laying the foundation, which includes waterproofing layers, lean concrete, and steel-reinforced footings.

Step 2: Columns and Beams

Once the base is laid, vertical columns and horizontal beams are constructed using steel, cement, and concrete. These elements support the entire load of the building.

Step 3: Walls and Slabs

Walls are erected using bricks and mortar. Slabs are laid on each floor, involving centering and shuttering followed by RCC pouring.

Step 4: Roofing

Roof construction involves more steel reinforcement and concrete work. Staircases are often cast during this phase.

Step 5: Plastering and Cement Work

Both interior and exterior walls are plastered. This provides a smooth base for future paint and finishing work.

Step 6: Installation of Plumbing and Electric Conduits

This stage involves laying basic PVC piping and electrical conduits inside walls and floors.

Step 7: Boundary Wall and Tanks

Water tanks (overhead and underground) and the boundary wall are constructed at this stage.

Labor Cost in Grey Structure

Labor is a major component of the grey structure cost. Contractors in Lahore typically charge for labor either on a per square foot basis or lump-sum for the entire structure. Skilled and unskilled workers include:

Masons (Raj/Mistri)

Steel fixers

Plumbers

Electricians

Helpers and cleaners

Labor efficiency, availability, and contractor credibility play important roles in budget control and timely delivery.

Additional Cost Considerations

There are some additional but essential expenses often overlooked:

Scaffolding & Shuttering: Required for slab casting and external plaster.

Transportation Costs: Moving heavy materials like gravel and steel to the construction site.

Water Supply: For mixing concrete and plastering. In some areas, water tanks or bowsers are required.

Waste Management: Disposal of excavated soil and construction waste.

Supervision Charges: Cost of project management or site supervision for quality assurance.

Construction Timeline for Grey Structure in Lahore

The time required for completing the grey structure depends on:

Plot size and number of storeys

Availability of labor and materials

Weather conditions

Efficiency of the contractor

Typically, a 5 Marla house grey structure can be completed in 2–3 months. Larger houses like 10 Marla or 1 Kanal may take 4–6 months or more.

Tips to Manage Grey Structure Costs

Hire Experienced Contractors – Avoid delays and rework by hiring professionals.

Stick to the Drawing Plan – Changing the layout midway adds unnecessary cost.

Bulk Purchase Materials – Buying materials in bulk can reduce costs through discounts.

Monitor Work Regularly – Regular supervision reduces the chances of errors and theft.

Avoid Delays – Delays can increase material prices and labor costs over time.

Why Grey Structure Planning Is Crucial

Grey structure planning isn’t just about saving money. It ensures your house is structurally sound, sustainable, and ready for future expansion or finishing. A poor foundation or weak concrete work can lead to cracks, water seepage, and higher long-term repair costs. That’s why budgeting and planning for the grey structure phase is critical.

Conclusion

Understanding the grey structure construction cost in Lahore is the first step to successful home building. Whether you’re building a compact 5 Marla house or a spacious 1 Kanal residence, careful planning, quality materials, skilled labor, and reliable supervision are key to staying on budget and ensuring structural integrity. As the market continues to evolve in 2025, staying informed about construction trends and costs helps homeowners make smarter decisions that save both time and money in the long run.